• 29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
  • 29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
  • 29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
  • 29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
  • 29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
  • 29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale

29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale

After-sales Service: 24 Hous Online
Warranty: 1 Year
Type: Concrete Pump
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale pictures & photos
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
US $12,000-36,000 / Set
Min. Order: 1 Set
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation

Basic Info.

Model NO.
HGY29 HGY33
Shotcrete Type
Wet
Machining Process
Hydraulic
Structure
Cylinder Type
Productivity
180m²/h
Feeding Height
1370mm
Vibrating Amplitude
2.0mm
Certification
ISO9001: 2000, CE
Condition
New
Color
as Your Option
Motor
15 Kw
Brand
Saintyol Dawin Machinery
Series
29m 33m
Key Word
29m 33m Hydraulic Self-Climbing Placing Boom
Control
Proportional Remote / Wire Control
Column
22.7m
Boom Arms
Detachable
Valve
Proportional
Placing Model
3 Sections / R Folding
Transport Package
Standard Exporting Package
Specification
CE ISO
Trademark
Saintyol DAWIN
Origin
Qingdao Shandong
HS Code
84134000
Production Capacity
2000 Sets/Year

Product Description

 
Tower Column hydraulic jack-up concrete placing boom, Self-climbing type, climbing by floor frame or by shaft frame. Mainly used for concrete placing of construction project, including civil construction, plant construction, bridge construction, beam yard, nuclear power plant, infrastructure, etc.
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale

Charactics

Modular design, mechanical and electrical integration control, folding boom, tube column, floor frame and shaft frame. Integration of advanced features and product diversification, to achieve a higher product portfolio, improve the applicability of the product.

Imported hydraulic and electrical components, adopt quality fast coupling for hydraulic pipelines, which is converted quickly,  it can effectively solve the problem of oil leakage in the process of  assembling and dismantling, and avoid the pollution of the environment. Safety and reliability

sections R type hydraulic boom, large circular arc, novel and beautiful appearance, compact structure, and the lightweight design of the boom, which reduced the weight of the whole machine..

Easy to transport and install.

Equipped with self-climbing frames which are driven by hydraulic and which climb up automatically from the present floor to the desired floor along the holes initially prepared in elevator well, the placing booms rise with the rising floor, saving time and labor.
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale

Features

A.Boom
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.

B. Hydraulic system
C  series products adopted Germany Rexroth solenoid directional control valve and balance valve
 with secondary overflow. It has effectively avoided the potential damages of boom
 which might be caused by over speed movement when the boom drops down, and sudden 
increase of oil cylinder's pressure under external forces, thus the reliability of the boom
 has been increased.

C.Inner Hydraulic Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big 
convenient for installation, dismounting and maintenance, which ensure longer service 
life and excellent performance.

D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.

E.Slewing Mechanism and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with 
a great torsion. Being accompanied with the integrated slewing balance valve made by 
Germany Hawei, it achieves smooth operation and reliable and stable performance.

F.Wireless Remote Controller
C series products adopt industry-exclusive analogue wireless remote controller made by Taiwan TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.

G.Electric Control System
The electric control system adopted world famous brand of electric components, such 
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system's reliability.

H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
 
Option: 
u  Inner-climbing frames: Floor frames or Wall frames(Shaft frames)
u  Column: 2m-10m.
u  Mode of slewing: Gear slewing or rack & Bearing of stepless slewing.
u  Voltage: 380V/50Hz or 440V/60Hz
u  Radio remote Control: Tele Crane HBC or AUTEC
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale

29m Tower Jack-up Concrete Placing boom Specifications:
Model Units HGY29C
Performance Max.radius of placing boom m 28.9
Freestanding height (to the joint between the end of the boom and swivel table) m 22.7
Boom articulation ° 400
Slewing brake / always close
Working temperature ºC 0ºC~60ºC
Total weight kg 19100
Counter weight kg Have no
Power / 380V/50HZ
Motor Model / Y2-160M-4
Power kW 11
Hydraulic system
 
Pressure MPa 30
Flux l/min 18
Hydraulic oil
 
Circumstance temperature 35ºC-50ºC / L-HM 68
Circumstance temperature 5ºC-35ºC / L-HM 46
Circumstance temperature -15ºC-5ºC / L-HM 32
Control mode
 
/ Short-haul Control /radio remote control
Pipeline cleaning / Wet cleaning/Dry cleaning
 
Structure of tower body / Tubular column
Section of tower body m×m 0.75×0.75
Boom
 
Shape / Three hydraulic foldable arms
Inner diameter of pipeline mm DN125
End hose ″×mm 5″×3000
1st section Length m 11.5
Articulation ° 0°~82.5°
2nd section Length m 9.3
Articulation ° 0°~180°
3rd section Length m 8.1
Articulation ° 0°~180°
Climbing
 
Climbing mode / By hydraulic cylinder climbing
 
Interval of climbing m 0.52
Floor frame / Hole prepared in floor
 
Shaft frame m Hole prepared in floor
2.0~2.7
Min.Interval of climbing frame Climbing m 3.0
Placing concrete m 6.0
Rest m 6.0 
29m Placing BoomWorking Range :
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale

33m Tower Jack-up Concrete Placing boom Specifications:
Model Units HGY33E
Performance Max.radius of placing boom m 33
Freestanding height (to the joint between the end of the boom and swivel table) m 22.7
Boom articulation ° 400
Slewing brake / always close
Working temperature ºC 0ºC~60ºC
Total weight kg 21200
Counter weight kg Have no 
Power / 380V/50HZ
Motor
 
Model / Y2-160L-4
Power kW 15
Hydraulic system
 
Pressure MPa 30
Flux l/min 18
Hydraulic oil
 
Circumstance temperature 35ºC-50ºC / L-HM 68
Circumstance temperature 5ºC-35ºC / L-HM 46
Circumstance temperature -15ºC-5ºC / L-HM 32
Control mode / Short-haul Control /radio remote control
Pipeline cleaning / Wet cleaning/Dry cleaning
 
Structure of tower body / Tubular column
Section of tower body m×m 0.75×0.75
Boom
 
Shape / Three hydraulic foldable arms
Inner diameter of pipeline mm DN125
End hose ″×mm 5″×3000
1st section
 
Length m 12.38
Articulation ° 0°~82.5°
2nd section Length m 10.93
Articulation ° 0°~180°
3rd section
 
Length m 9.69
Articulation ° 0°~180°
Climbing
 
Climbing mode / By hydraulic cylinder climbing
Interval of climbing m 0.52
Floor frame / Hole prepared in floor
Shaft frame m Hole prepared in floor
2.0~2.7
Min.Interval of climbing frame Climbing m 3.0
Placing concrete m 6.0
Rest m 6.0 
  33m Placing BoomWorking Range :
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale

Tower Column Concrete Placing Boom Installation:
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
Tower Placing Boom Job site Performance:
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
 

Send your message to this supplier

*From:
*To:
avatar Mr. Michael Liu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale pictures & photos
29m 33m Elevator Shaft Jack-up Concrete Placing Boom on Sale
US $12,000-36,000 / Set
Min. Order: 1 Set
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation
Type of Ownership
Limited Company
Plant Area
>2000 square meters